X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine

Product Details
Customization: Available
After-sales Service: 1year Warranty
Appearance: Closed-Type
Still deciding? Get samples of US$ 500/Set
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (15)
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
  • X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
Find Similar Products

Basic Info.

Model NO.
JT-X800G
Warranty
1 Year
Operation
Microcomputer Controller
Transport Package
Wooden Case Picking
Origin
China
Production Capacity
1000PCS/Month

Product Description

X800G Industrial Plastic Material Auto loader Separate Vacuum Hopper Loader Loading Machine

Stainless steel hopper, to ensure that the raw material is not contaminated.
Microcomputer control, simple operation, precise control, and there are number of alarm indicator.

Motor protection device, can increase its service life.
Lack of alarm, can take the initiative to inform customers of the situation.
Independent filter device to facilitate the removal of dust; filter view window, to facilitate customers to view the use of filter, and regular cleaning. Vacuum hopper can be directly installed in the molding machine hopper;
electric eye hopper can be directly installed in the molding machine feeding port. Optional cyclone dust collector, reducing filter cleaning times, suitable for crushing and conveying.
Optional Europeanization of material two proportional valve (including purchase control box), for new material and powder mixture use or crushed material immediate recovery.
Model  X800G
Motor 1.1kw/1.5hp   3φ
Conveying capacity(kg/hr) 430
Loading distance(m) 4
Static wind pressure(mm/H2O) 1800
Reservoir volume(L) 7.5L
Conveying tube inner dimeter φ38
Specification of the attached hoses φ38mm×4m    2pcs
Dimensions (mm) Main Frame 72*55*108
Hopper 33*38*45
Voltage 380v/50hz 3phase 
Net weight(KG) 65

X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading MachineX800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading MachineX800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine

X800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading MachineX800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading MachineX800g Industrial Plastic Material Auto Loader Separate Vacuum Hopper Loader Loading Machine
FAQ
1.  Are you a manufacturer?
A: Yes
 

2.  How about your warranty?
A: 1.All of our products for one year warranty.
     2.24-hour telephone service.
     3.A large stock of components and parts, easily worn parts.
     4.Toolkit will attach with Machine

3. Can robot be put on cilent's logo?
A: Yes

4. How can you guarantee we receive a good performance product?
A: Every machine will be tested before shipping.Jietou applied series inspection process during production
When the machine was finished. QC will provide inspection video and pictures for double check the quality control,
and we will send the troubleshoot and solutions if needed.also third part or customers come to the factory have field inspection is welcome.

5. Who do I talk to when I want to start an application?
A: Jietou has experiences of sales engineers to provide the assistance and support you require.


6. How soon can you deliver the equipment?
A:1-7 days(stock available), Customized equipment or no inventory machine normally need 15-25 days.
 

7. What is your payment term?
A:The payment method is TT,50% prepayment,50% balance before cargo delivery.

8. How to buy your machine?
A: advise specification → confirm model&price→ sign a PI →pay the deposit,
 →machine manufacture→pay the balance→ ship out and provide the tracking number.
 



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier